what was meant to happen?
we did 3 rows of footing for our house, but one of the outside rows 3m
of that row was sopose to come in 0.9m.
what did happen?
that row of footing that was sopose to come in 0.9m, didn't come in. insteed it just went
straight though.
why did it happen?
the boss didnt follow the plan and went off what he thought it was to be.
(goes to show some one with all that Experience can make mistakes to.)
what did we do to fix it?
so we made tempory piles out of timber in the right place wher ethe footing where sopose to be.
we were able to do this cause the house we were building was going to be moved after we
have built it.